West Campus Data Center Uptime Report

Fiscal Year Scheduled Maintenance (hours) Unscheduled Downtime (hours) Percent Downtime Percent Uptime
2017 0 0 0.00% 100.0%
2018 0 0 0.00% 100.0%
2019 1 1 0 0.00% 100.0%
2020 0 0 0.00% 100.0%
2021 24 2 0 0.00% 100.0%
2022 27 3 0 0.00% 100.0%
2023 24 4 0 0.00% 100.0%
2024 40 5 0 0.00% 100.0%
2025 0 0 0.00% 100.0%

1 2019 WCDC Data Hall 1B installation of an A side and B side PDUs. Only one power feed was taken down at a time. Power to hardware was not interrupted.

2 2021 WCDC Data Hall 1A installation of an A side and B side electrical busways. Only one power feed was taken down at a time. Power to hardware was not interrupted.

3 2022 WCDC Generator load transfer. Transfer testing of building load to generator power (3 hrs.). UPS battery replacement (B&D battery banks 24 hrs.) No services interrupted.

4 2023 Installation of new electrical busways for ACES in data hall 1A. No services interrupted.

5 2024 UES transformer maintenance/repair upstream from WCDC. No services were interrupted.

Main Campus Data Center Uptime Report

Fiscal Year Scheduled Maintenance (hours) Unscheduled Downtime (hours) Percent Downtime Percent Uptime
2003 0 0 0.00% 100.0%
2004 0 4 0.05% 99.95%
2005 0 0 0.00% 100.0%
2006 0 6 0.07% 99.93%
2007 0 6 0.07% 99.93%
2008 4 1 0.06% 99.94%
2009 6 4 0.11% 99.89%
2010 0 0 0.00% 100.0%
2011 18 0 0.21% 99.79%
2012 0 0 0.00% 100.0%
2013 0 2 1 0.02% 99.98%
2014 0 0 0.00% 100.0%
2015 0 0 0.00% 100.0%
2016 0 0 0.00% 100.0%
2017 0 0 0.00% 100.0%
2018 0 8 2 0.09% 99.91%
2019 0 3 3 0.03% 99.97%
2020 0 3 4 0.03% 99.97%
2021 8 5 0 0.00% 100.00%
2022 1 6 0 0.00% 100.00%
2023 15 7 0 0.00% 100.00%
2024 0 0 0.00% 100.00%
2025 0 0 0.00% 100.00%

1 2013 MCDC unscheduled outage was limited to a partial network outage due to the failure of a power breaker that fed power to a PDU. Power to the impacted network hardware was restored in less than two hours.

2 2018 MCDC unscheduled outage was limited to the failure of UPS-A. The MCDC has two UPSs, prior to this outage Technology Services had added additional UPS capacity to UPS-B but an additional PDU required to supply circuits in the MCDC was scheduled but had not been completed.  Since this outage a new PDU has been installed and A and B power is available for all systems in MCDC.

3 2019 MCDC UPS-A Unscheduled Downtime occurred when several capacitors failed during a power failure. Systems that were waiting on scheduled maintenance windows to migrated  their power connections to the provided UPS-B connections loss power.

4 2020 MCDC UPS-A Unscheduled Downtime was due to a previously unidentified neutral requirement for a non-critical load. The actual outage was limit to the few systems that only have one power feed. At the time of the incident power was run to the these systems from UPS-B. The actual outage was less than three hours, and the UPS-A system downtime was approximately 21 hours.

5 2021 Installation of step-down transformer for automatic transfer switch (ATS). No interruption to services.

6 2022 Disconnect PDU-14 from the EPO system. Decommissioning the ADA super computing system. No services interrupted.

7 2023 Software upgrade to UPS-A. UPS-B preventive maintenance, replacement of capacitors and fans (work done over 2 weekends) No interruption to services. Generator building load test, no services interrupted.